Studio Type B – 12 in total

Plan

Sellable area: 50.0 sq.m.
Apartment numbers:
First Floor: 103, 105, 107, 109, 111, 113
Second Floor: 203, 205, 207, 209, 211, 213
Room: 6.8 x 3.7
Toilet: 1.4 x 2.4

Property features

  • Bathrooms:
    Ceramic wall tiles up to 7ft
    Hindware fittings – Wall-mounted W.C.
    Oval wash basins
    Granite counters
    Premium Jaguar fittings
    Prince Plumbing
    Extractor Fan point

    • Flooring:
      Living Areas - Vitrified Tiling and Skirting
      Bathrooms/Balconies – Anti-Skid ceramic tiles

      • Wall finish:
        Internal Walls: Gypsum finish with emulsion paint
        External Walls: Weather coat Apex paint

        • Kitchen:
          Granite Platforms with SS sink and drain board
          Dado ceramic tiles 600mm above counter
          Aquaguard water filter point
          Extractor fan point

          Amenities

          • Just minutes away from Palolem Beach
          • Car Parking Facilities
          • Children’s Play Area
          • Landscaped Gardens
          • Schindler (Switzerland) Lifts
          • Cummins CPCB Eco-Friendly Generators
          • Emergency Back-up Supply to Lifts and all Common Areas
          • 24hr manned security
          • Beautifully architectured and designed
          • Doors / windows:
            Fibreglass bathroom doors
            Anodised Aluminium sliding doors and windows with mosquito screens

            • Electrical:
              3-phase wiring
              Finolex cables
              Invertor point
              Anchor Roma Modular switches
              Geyser points in bathrooms
              A/C points in all living areas
              Washing Machine Point

            • Other:
              Use of fly-ash Bricks for Construction
              Garbage Disposal Facilities
              Extensive Landscaping

              Payment Plan

              1 At the time of booking 10%
              2 Construction of plinth 15%
              3 Casting of first slab 15%
              4 Casting of second slab 15%
              5 Casting of Roof slab 15%
              6 Time of Plastering 10%
              7 Time of plumbing and electricity 10%
              8 Time of tiling 5%
              9 Time of painting 4%
              10 Time of possession 1%