1 BHK Type B with balcony – 4 in total

Plan

Sellable area: 67.0 sq.m.
Apartment numbers:
Second Floor: 209
Third Floor: 309
Fourth Floor: 409
Fifth Floor: 509
Bedroom: 3.4 x 3.9
Pantry: 1.8 x 2.6
Toilet: 2.4 x 1.2
Living/Dining: 3.4 x 5.4
Balcony: 2.1 x 0.9

Property features

  • Bathrooms:
    Ceramic wall tiles up to 7ft
    Hindware fittings – Wall-mounted W.C.
    Oval wash basins
    Granite counters
    Premium Jaguar fittings
    Prince Plumbing
    Extractor Fan point

    • Flooring:
      Living Areas - Vitrified Tiling and Skirting
      Bathrooms/Balconies – Anti-Skid ceramic tiles

      • Wall finish:
        Internal Walls: Gypsum finish with emulsion paint
        External Walls: Weather coat Apex paint

        • Kitchen:
          Granite Platforms with SS sink and drain board
          Dado ceramic tiles 600mm above counter
          Aquaguard water filter point
          Extractor fan point

          Amenities

          • Car Parking Facilities
          • Landscaped Gardens
          • Schindler (Switzerland) Lifts
          • Cummins CPCB Eco-Friendly Generators
          • Emergency Back-up Supply to Lifts
          • Visitors Parking
          • Doors / windows:
            Fibreglass bathroom doors
            Anodised Aluminium sliding doors and windows with mosquito screens

            • Electrical:
              3-phase wiring
              Finolex cables
              Invertor point
              Anchor Roma Modular switches
              Geyser points in bathrooms
              A/C points in all living areas
              Washing Machine Point

            • Other:
              Use of fly-ash Bricks for Construction
              Garbage Disposal Facilities
              Extensive Landscaping

              Payment Plan

              1 At the time of booking 10%
              2 Construction of plinth 10%
              3 Casting of 1st Slab 10%
              4 Casting of 2nd Slab 10%
              5 Casting of 3rd Slab 10%
              6 Casting of 4th Slab 10%
              7 Casting of 5th Slab 10%
              8 Casting of Roof Slab 10%
              9 Time of Plastering 7%
              10 Time of plumbing and electricity 6%
              11 Time of painting 6%
              12 Time of possession 1%